Project plate 01
Hortus integralis
Awbrey Butte terraces
Awbrey Butte, Bend
4,200 sq ft · 12 wks · 2026
Three dry-laid basalt terraces hold the slope and frame beds of penstemon, manzanita and blue grama.
PL. I · Landscape design & build · Bend, OR
We design, pave, plant and water Central Oregon gardens as one job, from the first sketch to the last drip emitter.
Section A–A · Garden construction
Field studies · Central Oregon
Project plate 01
Hortus integralis
Awbrey Butte, Bend
4,200 sq ft · 12 wks · 2026
Three dry-laid basalt terraces hold the slope and frame beds of penstemon, manzanita and blue grama.
Project plate 02
Hortus plantatus
Old Farm District, Bend
2,600 sq ft · 5 wks · 2026
A native meadow on four drip zones uses about a third of the water.
Project plate 03
Opus lapideum
Tumalo
1,100 sq ft · 4 wks · 2025
A flagstone courtyard and a low basalt seat wall make a level place to sit.
A site visit to the first season
60 minutes · free within our service area
Walk the yard with a designer, talk through how you use it and look at slope, access and sun together.
2–4 weeks
We measure the site and draw up a layout and planting plan, with room to revise the details before work starts.
1–14 weeks
One crew grades the yard and lays the stone, sets plants at the right depth and tests the irrigation zones.
Through year one
We return for a spring start-up and autumn blow-out. Our plant guarantee covers the first year.
Field collection · Flora Deserti
Section B–B · Deschutes Country
Bend · Oregon
Near the foot of Pilot Butte. Stone yard visits are by appointment.
Directions to the studio| Monday | 7:00 am – 4:30 pm |
|---|---|
| Tuesday | 7:00 am – 4:30 pm |
| Wednesday | 7:00 am – 4:30 pm |
| Thursday | 7:00 am – 4:30 pm |
| Friday | 7:00 am – 4:30 pm |
| Saturday | 8:00 am – 12:00 pm |
| Sunday | Closed |
Times shown in Pacific Time